In short
When an inspector finds non-compliant work, RBI code 1.6 requires them to use the regulatory powers available to secure compliance and to report non-compliant work to the relevant building control authority. OSR 3.3 requires written communication of non-compliance. AI tools can draft these letters, notices and referrals, but they can cite the wrong regulation or Approved Document, describe the defect vaguely or set unrealistic deadlines. That can lead to notices that do not achieve compliance, delay costs, complaints from builders and owners, and in some cases claims.
Non-compliance letters, requests for further information, notices and referrals take time to draft and need to be precise. Building control software may offer AI drafting: the inspector enters the finding, and the tool proposes the wording, the regulation or Approved Document reference, the required remedy and a deadline. Generative AI is also used to summarise the history of a case for a referral to the local authority.
Speed is useful, because contraventions are easier and cheaper to put right before they are covered up. Where an RBCA cannot secure compliance itself, the code expects the non-compliant work to be reported to the relevant building control authority, which is usually the local authority. The referral then becomes the starting point for someone else's enforcement decision, so its accuracy matters as much as the original letter. Tools that track deadlines and prompt follow-up can help, provided the inspector still decides what happens next.
Several existing duties apply to this work:
See the RBI code of conduct and operational standards rules. Annex 2 of the RBI code requires the terms of engagement to explain the complaints policy, which is where disputes about enforcement letters may begin.
Generative AI may cite a superseded version of an Approved Document, confuse requirements across parts of Schedule 1, or describe a remedy that does not match the defect. A referral summary may leave out the steps the RBCA has already taken, making it harder for the local authority to act. A notice that is unclear about what must be done, or by when, invites argument rather than compliance.
Illustrative: an inspector uses an AI tool to draft a letter requiring a builder to remedy inadequate fire separation between an integral garage and a dwelling. The draft cites the wrong requirement and describes a remedy that would not achieve compliance. The builder carries it out, the inspector rejects the work, and the owner complains about cost and delay. The owner's solicitor asks who will pay for the abortive work.
A claim for abortive work or delay caused by a negligent instruction is usually treated as professional negligence, subject to the policy terms. Complaints that do not involve a demand for compensation may not trigger the policy, but they can become claims later, so circumstance notification rules matter. Wider liability for building defects can also reach associated companies through building liability orders. See PI insurance for building inspectors and approvers for the basics.
Put these controls in place:
Related: AI plans assessment, AI inspection records and completion and final certificates. Apex arranges PI for building control approvers and inspectors, and a broker can check how your policy responds to enforcement disputes. See the AI in building control hub.
Where you become aware of a breach of the Building Act 1984 and associated legislation, you must use the regulatory powers available to secure compliance and report non-compliant work to the relevant building control authority.
The drafting tool does not affect validity in itself. What matters is whether the notice is accurate, clear and properly issued. Wrong regulation references or vague requirements can make a notice ineffective, so an inspector should check every draft before it is sent.
A complaint without a demand for money may not be a claim under the policy, but it can become one. Claims for abortive work or delay caused by negligent instructions are usually treated as professional negligence, subject to the policy terms and notification conditions.
AI can draft a referral summary, but the inspector who handled the case should check it. A referral that omits steps already taken, or misdescribes the contravention, makes it harder for the local authority to act and weakens the record of how the RBCA met RBI code 1.6.
Tell us about your firm and the work you do. A broker will review how your current PI treats AI-assisted work, or arrange new cover. No fee for a quote. Or call 0117 325 0027.
Start a PI quote Request a callbackApex Insurance Brokers Limited is authorised and regulated by the Financial Conduct Authority. Registered in England and Wales, company number 07014570. This page is general information about how AI is used in the profession and how insurance may respond. It is not legal, regulatory or insurance advice on your circumstances, and it does not guarantee that cover will be available or on what terms.