Mid-market insurance
A rebuild valuation is a professional estimate of what it would cost to demolish, clear and rebuild an insured building to current standards after a total loss. It matters because the buildings sum insured is set from it, and an understated figure can reduce every claim, not only a total loss.
Part of: Commercial property owners insurance
In short
A rebuild valuation, or reinstatement cost assessment, estimates the full cost of rebuilding a property after it is destroyed, including demolition, debris removal, professional fees and compliance with current regulations. It is not market value and the two can differ widely. RICS publishes a professional standard for these assessments and treats an annual inflation adjustment plus a fuller review every three years as good practice. For a commercial owner or portfolio landlord, an accurate figure protects against average being applied to claims, supports a fair presentation of the risk and keeps insurance rent recharged to tenants defensible.
A rebuild valuation answers one question: if this building were destroyed tomorrow, what would it cost to put it back? That figure, usually called the reinstatement cost, is what most property policies expect the buildings sum insured to reflect. It is different from the price the building would fetch on the open market, its book value or the figure a lender uses.
The RICS professional standard Reinstatement cost assessment of buildings is clear that the declared value for insurance purposes has no direct relationship to market value. A city centre office block may be worth far more than its rebuild cost because of its location, while a specialist industrial unit or a heritage property in a low value area may cost much more to rebuild than it would sell for.
For owners with a commercial property owners policy or a property portfolio policy, the valuation is the foundation of the whole programme. Loss of rent, debris removal and many extensions are often expressed as a percentage of, or in relation to, the buildings sum insured, so an error flows through.
A reinstatement cost assessment is more than floor area multiplied by a rate. The RICS standard expects the surveyor to allow for the cost elements below, and to record the assumptions made.
| Element | Why it matters |
|---|---|
| Demolition and debris removal | Remaining structure has to be taken down and cleared before rebuilding starts. Policy wordings may limit debris removal to the site and adjacent areas. |
| Professional fees | Architects, engineers, surveyors and other consultants are needed to design and manage the rebuild. |
| Statutory requirements | The rebuild must comply with current Building Regulations and planning requirements, which may be more demanding than when the building went up. |
| VAT | The surveyor should record whether VAT is included. Whether you need it depends on your own VAT position, which is worth confirming with your accountant. |
| Abnormal costs | Restricted access, basements, party walls, specialist structure or traditional materials can add significant cost and time. |
| Inflation provision | Costs can rise during the policy year and during the design and rebuild period that follows a loss. |
Cost evidence may come from sources such as BCIS (the RICS building cost information service), price books and the surveyor's own costings. For larger or unusual buildings a measured survey by a qualified surveyor is generally more reliable than a desktop index or online calculator.
If the sum insured is lower than the true reinstatement cost, most commercial property policies contain an average condition. In simple terms, the insurer pays the same proportion of a claim as the sum insured bears to the value at risk. Average therefore affects partial losses as well as total ones. Our guide to underinsurance and the average clause sets out the mechanics.
Some policies apply a percentage condition of average, where claims are paid in full if the sum insured is at least a stated proportion of the true value. The RICS standard gives 85 per cent as an example. This helps with partial losses but does not rescue a total loss where the sum insured is simply too low.
Day one reinstatement cover works differently. You declare a reinstatement value as at the first day of the policy period and the insurer adds an uplift to cover inflation during the year and the rebuild period. RICS notes that uplifts commonly range from 15 to 50 per cent. Average is usually applied to the declared value rather than the uplifted limit, so the declared figure still needs to be right, subject to the policy terms.
Under section 3 of the Insurance Act 2015 a business must make a fair presentation of the risk before a contract is entered into. Sums insured and the basis on which they were calculated form part of what you tell insurers, so a documented valuation is useful evidence of a careful presentation.
Listed and historic buildings need particular care. RICS advises surveyors to confirm listing status and category, because listing can affect reinstatement cost. Listed building consent is commonly required for works, and the planning authority may insist on matching materials or traditional techniques, which can add abnormal costs and programme delays. See our page on listed building insurance for how cover is usually structured.
Specialist properties such as care homes, laboratories, hotels and buildings with complex services carry fit out and plant that a generic rate will miss. The same logic applies to education estates, covered in our guide to school buildings reinstatement valuations.
For a portfolio, the schedule of sums insured is only as good as its weakest entry. A mid-sized landlord may have assets valued at different times, by different firms, on different bases. RICS treats an annual inflation adjustment and a major review every three years as good practice, with a fresh assessment after significant alterations. Where a policy is index linked, check when indexation actually applies, as it may only bite at renewal. On larger schedules, some insurers will contribute to the cost of valuations or arrange them, subject to their terms and the size of the account; it is worth asking at renewal. For more on structuring the programme, see insurance for commercial property portfolios.
These examples are illustrative only. Figures are invented round numbers to show the mechanics and are not taken from any real property or claim.
An owner insures a light industrial unit for 2,000,000 based on an old valuation. A fresh assessment would have put reinstatement at 3,000,000. A fire causes 600,000 of damage. Applying simple average, the insurer may pay two thirds of the loss, leaving the owner to fund around 200,000 plus the excess.
A Georgian terrace converted to offices is insured on a rate per square metre suitable for a modern office. After a serious fire the conservation officer requires lime render, handmade brick and replacement sash windows. The shortfall between the sum insured and the actual cost falls on the owner.
A landlord with twelve units revalues only the three largest. The remaining nine were last assessed years ago. If the policy applies average per item, any one of those older entries could produce a reduced settlement even though the overall schedule looks reasonable.
Before renewal, it is worth checking:
Apex arranges commercial property cover for owners and portfolio landlords and can help you review your schedule of sums insured; a broker reads every enquiry.
No. A rebuild valuation estimates the cost of demolishing, clearing and rebuilding the property to current standards. A market valuation estimates what a buyer would pay. RICS guidance says the declared value for insurance has no direct relationship to market value, and the two figures can differ significantly in either direction.
RICS treats an annual inflation adjustment and a major review every three years as good practice, plus a fresh assessment after significant alterations or a change of use. Your policy terms, lease obligations and lender requirements may set their own expectations, so check those as well.
Most commercial property policies include an average condition. If your sum insured is below the true reinstatement cost, the insurer may reduce any claim in proportion to the shortfall. That can apply to a modest partial loss as well as a total loss, subject to the policy wording.
Not entirely. Day one cover adds an inflation uplift above your declared value, but average is commonly applied against the declared value itself. If that declared figure is too low, a claim can still be reduced. The accuracy of the starting figure remains important.
Some insurers will contribute to or arrange valuations for larger commercial schedules, depending on their terms and the size of the account. It is not standard on every policy. It is worth raising at renewal, particularly where several buildings have not been assessed recently.
Send us your current schedules or renewal pack and we will review the whole programme and tell you plainly what to keep and what to change. No fee and no obligation. Or call 0117 325 0027.
Book a programme review Get a quoteApex Insurance Brokers Limited is authorised and regulated by the Financial Conduct Authority. Registered in England and Wales, company number 07014570. This page is general information, not advice on your individual circumstances, and it does not guarantee that cover will be available or on what terms.