Aipedia: Principal designers and building safety

AI design risk registers for CDM

An AI-generated design risk register can list many hazards without showing any were designed out, which is what CDM 2015 reg 9 requires. After an incident, that register may be one of the first documents an investigator or claimant reads.

In short

CDM 2015 reg 9 requires designers to eliminate foreseeable risks so far as reasonably practicable, then reduce or control what remains and pass information to the principal designer. Reg 11 requires the PD to ensure designers comply. AI tools can generate long registers with generic rows and mitigations that push risk to the contractor. That can show a risk was foreseeable but not designed out. Use AI to prompt thinking, cut generic entries, record design options considered, and have designers confirm their own entries.

Using AI in your work? Make sure your professional indemnity covers it. A specialist broker can check your wording and find cover that does.
Get a second opinion on your PIDoes PI cover AI mistakes?

How AI is used for design risk registers

Designer risk assessments and design risk registers record the foreseeable risks a design creates and what has been done about them. AI tools can now generate a register from a drawing set or description, populate standard columns and suggest mitigation. Project managers use similar tools for project risk registers.

The output often looks thorough: dozens of rows, each with a risk and a mitigation. But a register full of generic entries can obscure the few risks that matter on the project, and suggested "mitigations" are often instructions to the contractor rather than design changes.

For a principal designer, the register matters twice: once as a check that each designer has met its own duties, and again as the record the PD relies on to show it managed design risk across the project. The AI for principal designers overview sets out where this fits among other PD uses of AI.

The duties that apply

The emphasis is on elimination through design. A register is evidence of how that was done, not a substitute for it. The guide to PD duties and AI covers how these duties fit with Part 2A.

What can go wrong

Illustrative scenario. An AI-generated design risk register for a warehouse extension lists "work at height: contractor to provide edge protection" against the roof. The design included rooflights that could have been specified as non-fragile or protected, but no design option was considered. During later maintenance, a worker falls through a rooflight. The investigation looks at the register and finds the risk was identified but passed to others without any attempt to design it out.

Registers like this create three problems:

In post-incident investigations, registers are likely to be requested early. A boilerplate register can suggest the designer did not engage with the design, even if it did.

How PI usually responds

A civil claim alleging a PD failed to identify or eliminate a design risk would usually be treated as professional negligence, subject to the policy wording. Fines following a prosecution are generally not covered. Bodily injury claims arising from professional advice are commonly within PI, but check the wording, as some policies handle them differently from employers' or public liability. Apex's note on CDM principal designer PI risk looks at this in more depth.

Practical controls

How Apex helps

Apex arranges PI for CDM principal designers. A broker can check how your policy treats injury-related claims arising from design and whether your declared activities reflect the PD role.

Sources

Frequently asked

Is a design risk register a legal requirement?

CDM 2015 does not prescribe a register by name. Reg 9 requires designers to eliminate, reduce or control foreseeable risks and pass on information, and a register is a common way of recording how that was done.

Why is a long AI-generated register a problem?

It can show many risks were foreseen while showing little was designed out. In an investigation, that can count against the designer and PD. A shorter register focused on design decisions is usually more useful.

Does PI cover injury claims from design risks?

PI commonly covers claims arising from negligent professional services, which can include injury, but the position depends on the wording and on other policies held. Check with your broker how bodily injury from design is handled.

Check your PI covers how you use AI

Tell us about your firm and the work you do. A broker will review how your current PI treats AI-assisted work, or arrange new cover. No fee for a quote. Or call 0117 325 0027.

Start a PI quote Request a callback

Apex Insurance Brokers Limited is authorised and regulated by the Financial Conduct Authority. Registered in England and Wales, company number 07014570. This page is general information about how AI is used in the profession and how insurance may respond. It is not legal, regulatory or insurance advice on your circumstances, and it does not guarantee that cover will be available or on what terms.