FCA authorised · FRN 724952 0117 325 0027Quote & buy →
Apex Insurance Brokers
Speak to a brokerGet a quote →

Contractors who design

Professional indemnity insurance for garage and shed erectors

Garage and shed erectors need professional indemnity insurance if they design bespoke buildings, specify bases, advise on where a building can go or tell customers that no permission is needed. Erecting a kit building exactly to the manufacturer’s instructions carries less professional risk, but siting and base advice is still yours. Public liability covers accidents on site; it usually won’t pay to move, lower or re-base a building because your advice or design was wrong.

In short

The PI risk for garage, shed and garden room businesses sits in the advice and design that come with the building. In England, a detached single-storey building of more than 15 m² and up to 30 m², with no sleeping accommodation, is exempt from the Building Regulations only if it is at least a metre from the boundary or substantially non-combustible. Permitted development limits outbuildings within two metres of a boundary to 2.5 metres high. The Party Wall Act requires notice before building on the boundary line. Get any of these wrong and the customer’s loss is financial, which public liability usually won’t cover.

Start your PI proposal →or call 0117 325 0027 to speak to a broker

Why garage and shed erectors need PI

Last reviewed 5 October 2026 by the Apex professional indemnity team.

A garage or shed looks like a product, but the customer is often buying your judgement as well: which building suits the plot, where it can go, what base it needs and whether anyone has to approve it. When that judgement is wrong, the loss is usually financial. The building has to be moved, cut down, re-based or put through a retrospective application. That is professional indemnity (PI) territory.

Public liability (PL) responds to accidents during the work: a panel dropped on a neighbour’s car, a customer who trips over your materials. It is not designed to pay for a building in the wrong place, or one that needed permission it never got. PL wordings usually exclude the cost of your own work and pure financial loss, and many exclude claims that something you supplied failed to perform.

How much PI matters depends on what you sell:

How claims arise for garage and shed erectors

Read these as illustrative examples, not real claims. They show how disputes with garage and shed customers usually develop.

  1. A garden office that is too tall. A supplier designs and erects a mono-pitch garden office with a 2.8 metre high point, 1.5 metres from the rear fence, and tells the customer it is permitted development. The council disagrees, a retrospective application is refused and the building has to be lowered. The customer claims the alteration costs, alleging the advice and design ignored the height limit near a boundary.
  2. A workshop in the wrong spot. A 22 square metre timber workshop is sited half a metre from the boundary. Because it is combustible, larger than 15 square metres and within a metre of the boundary, it isn’t exempt from the Building Regulations. Building control takes an interest and the owner claims the cost of moving it.
  3. A garage wall on the boundary line. A new brick-and-block garage is built with its flank wall on the line between two gardens. No party wall notice is served because the installer said none was needed. The neighbour’s surveyor gets involved, work stops, and the customer claims the surveyors’ fees and delay.
  4. A base that couldn’t cope. A sectional concrete garage goes onto a base specified without allowing for clay soil and a nearby hedge. The base cracks, panels move and the door stops closing. The customer claims for a new base and re-erection, alleging the specification was negligent.
  5. A guest room that changed the rules. A garden room is sold as somewhere for visitors to sleep. Sleeping accommodation takes it outside the exemption for small detached buildings, so it needs approval it was never given. The owner claims the cost of upgrades, relying on sales literature that said no building regulations were needed.

All five turn on advice or design, not accidents. That is why install-and-supply businesses in this trade still face PI claims.

Rules that decide whether your advice was right

These are the rules that decide whether a garage, shed or garden building was correctly advised on and designed. The building regulations and planning rules below apply in England; the Party Wall Act applies in England and Wales.

RuleWhat it saysWhy it matters to you
Building Regulations 2010, Schedule 2, Class 6A detached single-storey building of no more than 30 m², with no sleeping accommodation, is exempt if no part is less than one metre from the boundary or it is built substantially of non-combustible material. A detached building of up to 15 m² with no sleeping accommodation is exempt wherever it sits.Size, materials, use and position all affect the answer you give the customer.
Building Regulations 2010, Schedule 2, Class 7A ground-level carport open on at least two sides, with a floor area of no more than 30 m², is an exempt extension. Attached garages are not on the list.Attaching a garage to the house changes the approval route.
Building Regulations 2010, regulation 9Part P (electrical safety) applies to an exempt detached building that takes its electricity from a dwelling, and parts of Part G apply if its water supply is shared with one.Exempt buildings with power or water still carry compliance duties.
Town and Country Planning (General Permitted Development) (England) Order 2015, Class EOutbuildings may not exceed 2.5 metres in height within 2 metres of the boundary, 4 metres with a dual-pitched roof or 3 metres otherwise, or 2.5 metres at the eaves. They cannot sit forward of the principal elevation, cover more than half the curtilage, or be built within the curtilage of a listed building.The most common source of “you won’t need planning” disputes.
Party Wall etc. Act 1996, sections 1 and 6Building a wall on or up to the line between two properties needs notice at least one month before work starts. Excavating near a neighbour’s building or structure, within three metres and in some cases six, can also require notice.The duty is the building owner’s, but customers rely on you to tell them it exists.
HSE guidance on asbestosAsbestos may be present in any building built or refurbished before 2000, including asbestos cement roofs. Removing asbestos cement carefully, without breaking it up, is generally non-licensed work but still needs a risk assessment, trained workers and controls.Taking down an old garage is not just demolition. It is a regulated task with its own insurance problems.

Siting advice: the measurements that cause most claims

Most siting mistakes come down to four measurements. Learn them, write them on the survey sheet, and record which applied to each job.

Use, materials and the property’s status change the answer too. Sleeping accommodation removes the small-building exemption. Listed buildings lose the outbuilding allowance in their curtilage, and the government’s householder guidance notes that councils can remove permitted development rights by an Article 4 direction or a planning condition. If you are not certain, tell the customer in writing to check with the council before they order.

Replacement jobs need one more check. HSE says asbestos may be present in any building built or refurbished before 2000, and asbestos cement roof sheets are a classic example. Removing them intact is generally non-licensed work, but it still requires a risk assessment, trained people and controls. Most PI and public liability policies exclude or restrict asbestos, so don’t assume either will respond if old sheets are broken up and a garden is contaminated. See the asbestos exclusion in professional indemnity.

What PI covers for garage and shed erectors, and what it doesn’t

Usually covered by PIOften excluded or limitedNeeds a different policy
Negligent advice on planning, building regulations or party wall noticesAsbestos, including disturbance during demolitionAccidental injury or damage during erection (public liability)
Wrong specification of bases and foundationsRemedying your own defective workmanshipInjury or damage caused by a building you supplied (products liability)
Design errors in bespoke buildings, such as spans and roof loadingsManufacturers’ and suppliers’ product guaranteesInjury to your own staff (employers’ liability)
Inaccurate statements about approvals in quotations or sales materialContract terms promising more than reasonable skill and careVans, cranes and lifting equipment (motor and plant policies)
Defence costs, including surveyors’ and planning consultants’ reportsClaims arising from circumstances you knew about before cover beganStock and display buildings at your premises (property cover)

Many erectors buy PI as an add-on to a trade policy. If so, check the limit, and check that the business description covers design and advice rather than erection alone. Every policy is subject to the insurer’s acceptance and its terms.

Choosing a limit and keeping cover after the job

Homeowners rarely ask for a PI certificate, so you will normally choose the limit yourself. Size it on a bad but realistic claim: dismantling and re-erecting your largest building, a new base, the neighbour’s surveyor and legal costs, and any planning consultant the customer hires. Schools, councils, sports clubs and commercial customers may set a minimum in their terms, and main contractors will set one in subcontracts.

Cover needs to last beyond the job. PI is claims-made, so a complaint about a garden room you put up three years ago is handled by whichever policy you have when it arrives. Planning enforcement in particular can come years later, after a neighbour complains or the house is sold. If you retire or close the business, run-off cover protects the work you have already done.

Sole traders are common in this trade, and the same rules apply to them. See PI insurance for sole traders.

What insurers will ask you

A complete proposal gets better terms than a bare one, and a broker can only present what you tell us. Have these ready:

Speak to a broker

PI for garage and shed erectors, placed by a named broker

Start the online proposal and save it as you go, or leave your number and a named broker will call you back, usually the same working day.

Start your PI proposal →or call 0117 325 0027

How Apex places this cover

Apex Insurance Brokers is an independent insurance broker based in Bristol, established in 2009 and authorised and regulated by the Financial Conduct Authority. We are not tied to one insurer: we work with over 30 markets, including Lloyd’s syndicates through wholesale brokers, and every client has a named broker who handles the placement, mid-term changes, certificates for clients and the renewal.

Related guides

Sources

Frequently asked

Do garage and shed erectors need professional indemnity insurance?

If you design buildings, specify bases or advise customers on siting, planning or building regulations, you should have it. Public liability covers accidents during erection, but it usually won’t pay to move, lower or re-base a building because your advice or design was wrong. PI responds to those claims, subject to the policy terms.

Is PI a legal requirement for garage and shed erectors?

No. No law requires garage, shed or garden building businesses to hold PI, and most homeowners don’t ask for it. Schools, councils, commercial customers and main contractors may require it in their contract terms, sometimes with a minimum limit.

Do I need PI if I only erect kit buildings?

Your design risk is lower, but customers still rely on you for siting, base preparation and what they need to tell the council. Wrong answers on any of those can lead to a claim for moving or altering the building, which PL won’t usually meet.

Am I liable if a customer’s garden room needs planning permission?

The customer is responsible for getting permission, but if they relied on your advice that none was needed, they may claim the cost of a retrospective application, alterations or removal from you. PI can respond to that claim, subject to the policy terms.

Does PI cover asbestos found when removing an old garage?

Usually not. Most PI and public liability policies exclude or restrict asbestos claims. HSE guidance says asbestos may be present in buildings built or refurbished before 2000, so check for asbestos cement before you quote and follow HSE guidance if you remove it.

Does insurance cover a garage base that cracks?

Public liability won’t usually pay to replace a defective base you laid, and PI rarely pays to rectify your own workmanship. If the customer alleges your base specification was negligent and claims the loss that followed, PI may respond, subject to the policy terms.

Ready to compare cover?

Apex arranges professional indemnity insurance for garage and shed erectors across the UK. Tell us about your work and we’ll find cover that fits. Or call 0117 325 0027.

Start your PI proposal Call 0117 325 0027

Apex Insurance Brokers Limited is authorised and regulated by the Financial Conduct Authority. Registered in England and Wales, company number 07014570. This page is general information, not advice on your individual circumstances. Cover is always subject to the insurer’s acceptance and the policy terms, and this page does not guarantee that cover will be available or on what terms.